Loading...
Loading...
Track every document you need to file for your NYC ADU permit. Check items off as you gather them to track your progress.
Gather these foundational documents before engaging your design professional.
Your architect and engineers produce these technical documents.
Zoning analysis and environmental clearances needed before filing.
Final assembly and submission through the DOB NOW portal.
Even with an HPD pre-approved plan, you are still required to provide site-specific documents including: utility connections, zoning compliance analysis for your specific lot, foundation design adapted to your soil conditions, and DEP sewer certification. The pre-approved plan covers the architectural design only.
Our ADU specialists can guide you through every document and connect you with architects, engineers, and surveyors.